英文字典中文字典Word104.com



中文字典辭典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z   







請輸入英文單字,中文詞皆可:

請選擇你想看的字典辭典:
單詞字典翻譯
Coleton查看 Coleton 在Google字典中的解釋Google英翻中〔查看〕
Coleton查看 Coleton 在Yahoo字典中的解釋Yahoo英翻中〔查看〕





安裝中文字典英文字典查詢工具!


中文字典英文字典工具:
選擇顏色:
輸入中英文單字

































































英文字典中文字典相關資料:
  • U. S. NUCLEAR REGULATORY COMMISSION - NRC
    Regulatory Commission (NRC) considers acceptable for use by applicants and licensees for small modular reactors (SMRs), non-light-water reactors (non-LWRs), and non-power production or utilization facilities (NPUFs) to demonstrate compliance with performance -based emergency preparedness (EP)
  • Federal Register :: Emergency Preparedness for Small Modular Reactors and Other New . . .
    The NRC is concurrently issuing Regulatory Guide 1 242, “Performance-Based Emergency Preparedness for Small Modular Reactors, Non-Light-Water Reactors, and Non-Power Production or Utilization Facilities ” This final rule is effective on December 18, 2023
  • PART 52—LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS - NRC
    The NRC shall, no later than the date of publication of the notice of intended operation required by 10 CFR 52 103(a), make publicly available those licensee notifications under paragraph (c) of this section that have been submitted to the NRC at least seven (7) days before that notice
  • “SMR에 대형원전 ‘복붙’ 규제? 미국은 싹 뜯어고쳤다 . . .
    지난 2020년 nrc는 뉴스케일파워에 모듈당 77mw짜리 smr 허가를 내줄 때 230m 안에 epz를 마련하라는 정도의 조건만 내걸었다 다른 smr 개발업체인 홀텍도 지난해 12월 새 규제 지침에 따라 16km 제한에서 벗어났다
  • Advanced SE for NuScale EPZ Sizing Methodology Topical Report Non-Proprietary - NRC
    By letter dated June 10, 2022, NuScale Power, LLC (NuScale), submitted Revision 3 of licensing Topical Report (TR) TR-0915-17772 (Reference 1), titled “Methodology for Establishing the Technical Basis for Plume Exposure Emergency Planning Zones at NuScale Small Modular Reactor (SMR) Plant Sites ”
  • NRC to Issue Final Rule for Emergency Preparedness
    The rule, to be published in the Federal Register later this year, builds on the NRC’s existing emergency preparedness program for large, light-water cooled nuclear power reactors The rule and related guidance, when published, will address how state-of-the-art facility designs
  • SMR, LLC, Exemption Request to Utilize 50. 160 EP Rule
    Exemption Sought SMR, LLC is considering multiple options: 1 Request an exemption from 50 2 (definition of small modular reactor) 2 Request an exemption from 50 33, 50 34, and 50 54 3 Request exemptions from specific aspects of 50 47 and 10 CFR 50 Appendix E Result if approved: SMR-300 would be able to use 50 160 for EP in lieu of Appendix E
  • VR-SECY-22-0001: Rulemaking: Final Rule: Emergency Preparedness for Small . . . - NRC
    To achieve this, the NRC staff should update the draft final rule to provide that a site boundary EPZ for a commercial SMR or advanced reactor cannot be established without a written finding from NRC, FEMA, and the host state that offsite response organizations and offsite emergency planning at a particular site would provide for an effective an
  • EP for SMR ONT Rulemaking Update - NRC
    Use a risk-informed dose-based process for determining the size of the Plume Exposure Pathway EPZ There are two approaches: traditional and performance based Allow for smaller EPZ sizes than those for existing nuclear power reactors Require analysis of accident spectrum and consequences
  • Code of Federal Regulations - NRC
    The U S Nuclear Regulatory Commission (NRC) is amending its regulations to create an alternative, performance-based emergency preparedness (EP) framework in Title 10 of the Code of Federal Regulations (10 CFR) relating to EP for small modular reactors (SMRs) and other new technologies (ONTs)
  • Small Modular Reactors, Non-Light- Water Reactors, and Non-Power Production or . . . - NRC
    (1) An applicant for an operating license issued under this part after December 18, 2023 must establish, implement, and maintain an emergency preparedness program that meets the requirements of paragraph (b) of this section, as described in the emergency plan and license, and conduct an initial exercise to demonstrate this compliance
  • SMR, LLC Holtec International, NRC Meeting: Emergency Preparedness
    Plume Exposure Pathway EPZ (EPZ) -extending 10 miles in radius around the reactor site Protective action plans within this area are designed to avoid or reduce dose from potential exposures such as inhaling radioactive particles These actions include sheltering, evacuation, and the use of potassium iodide pills where appropriate Under





中文字典-英文字典  2005-2009

|中文姓名英譯,姓名翻譯 |简体中文英文字典