Building Connected? Your experiences, please. . . i don't think so, to be honest the fellow i spoke to, said there was *no* benefit to me to get the "pro" version he wanted to know how my bid process worked, my "workflow", etc i explained it, in that the phone will ring, it's someone looking for a lighting cert that i've never heard from before, and was referred by someone i've never heard from either and i'll quote them over the
Disconnect for Air Compressor | Information by Electrical Professionals . . . We have specified a 300HP, 480V 3-Phase air compressor with a manufacturer mounted controller with integral disconnect switch I was told the controller showed up on site with E-Stop button on the controller but no disconnect My question, can the E-Stop considered to be a disconnecting means
NEC 2017_Annex D_Example D8_Motors | Information by Electrical . . . Hi, I may be missing something very basic but can someone explain something to me about NEC 2017_Annex D_Example D8_Motors_Page 800? The example motor specs are given in the beginning (a) and (b) sections (a) is one 25-hp motor with a nameplate rating of 32 amps (b) is two 30-hp motors with
Confused about breaker size - round up or round down? Electric air handler with auxiliary heat strip being installed in Canada Motor FLA 2 1 amps Heat strip (8kW) 33 3 amps The unit has a built-in double pole 45 amp breaker which serves as the termination point for the supply line The manual states that the maximum amperage of the breaker in the
Does anyone make a flush mount external cluster meter main any more . . . Does anyone still make a flush mount meter main product? We have a panel that's shot, that's flush mount, and there's really no room for a modern panel Working space rules won't permit a surface mount solution, and various constraints hamper moving the service Old panel 200 amps, rule of 6
Any issue with Leviton load center | Information by Electrical . . . I see these used in some modular homes that are built in washington state At first I thought they looked like junk but when square D couldn't keep up with demand I bought a 200A 30 space 3R load center and thought it was better built that the Square D stuff, it certainly weighed more and i liked the available accessories like feed thru lugs On square D panels if you want feed thru you have
NFPA 101 SECTION 7. 8. 1. 2. 2-7. 8 ILLUMINATION OF MEANS OF EGRESS. The jurisdictions that I work in do not adopt that section of NFPA 101, so I can't talk from an enforcement standpoint, but your conclusion seems logical BTW, although many jurisdictions adopt portions of NFPA 101, most do not adopt the whole thing For example, egress lighting in most jurisdictions are per the adopted ICC Building Code Section 1008 For another example, the 2014 Florida
Fused disconnect at motor | Information by Electrical Professionals for . . . Per NEC 430, the breaker in electrical panel serving the motor will be sized at 250% of motor FLA What's about the fused disconnect at motor location, (downstream of the breaker), will the fuse inside disconnect be sized at 125% of motor FLA or higher? Assuming this fuse is served as circuit