Interstate 635 (Texas) - Wikipedia Interstate 635 (I-635[a]) is a 37-mile-long (60 km) partial loop around Dallas, Texas, in the United States between I-20 in Balch Springs and SH 121 at the north entrance of the DFW Airport in Grapevine It intersects I-35E at exits 27B and 27C but does not connect with I-35W
635 East Project - Texas Department of Transportation The 635 East Project is a $1 74 billion design-build roadway construction project by the Texas Department of Transportation to improve mobility, operations and safety along Interstate 635 (I-635) in Dallas County The project spans 11 miles beginning just east of US 75 in North Dallas to I-30 in Mesquite
Interstate 635 Texas - Interstate-Guide - AARoads Part of the Dallas beltway system, Interstate 635 (Lyndon B Johnson Freeway) wraps around the northern and eastern side of the city Known simply as the LBJ Freeway, IH 635 begins at Interstate 20 in Balch Springs and leads in a counterclockwise direction through Mesquite to Garland, Farmers Branch and IH 35E (Stemmons Freeway) Beyond IH 35E
635 East Project - garland information | Garland, TX The Texas Department of Transportation (TxDOT) is investing $1 74 billion into improving the 11-mile section of Interstate 635 East that serves Garland For more information about the project and to subscribe to traffic alerts, visit 635East com
635 - Wikipedia Year 635 (DCXXXV) was a common year starting on Sunday of the Julian calendar The denomination 635 for this year has been used since the early medieval period, when the Anno Domini calendar era became the prevalent method in Europe for naming years
I-635 East - balfourbeattyus. com The 635 East project will reconstruct and widen 11 miles of interstate highway from US 75 to I-30, including the I-635 I-30 interchange, and construct service roads and numerous intersection improvements to relieve congestion, provide local connectivity, and improve safety in Dallas, Texas
Closures - Texas Department of Transportation Use the interactive map below to view lane closures and project cameras Southbound I-635 direct connector access to both eastbound westbound I-30 will be shifted about 1 4 north of its existing location
INTERSTATE HIGHWAY NO. 635 From a junction with IH 35 E near south city limits of Dallas, eastward, northward, and westward to another junction with IH 35 E near north city limits of Dallas New Designation