英文字典中文字典Word104.com



中文字典辭典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z   


安裝中文字典英文字典辭典工具!

安裝中文字典英文字典辭典工具!








  • Overhead and cable lines - Enprom
    We render comprehensive services within the construction, reconstruction, and modernisation of high and highest voltage lines – from 110kV through 220kV up to 400kV We carry out turnkey work and provide legal services of investments at every stage of project We operate both in Poland and abroad
  • Types of power lines built in Poland - Alterga
    high voltage power lines (HV, in Poland with a voltage of 110 kV), used for power distribution over distances not exceeding several dozen kilometers to HV MV substations; medium voltage power lines (MV, in Poland with voltages of 10, 15, 20 or 30 kV), through which energy is sent to MV LV transformers
  • Using overhead covered conductors at high voltages
    A prototype high voltage line with covered conductors is in operation in Finland and similar conductors are now increasingly being considered for high voltage applications elsewhere, for example in Slovenia, Hungary, the UK and Poland
  • The high-voltage network (HV, in Poland with a voltage of 110 . . .
    The high-voltage network (HV, in Poland with a voltage of 110 kV) is used to transmit electricity over long distances between the power plant and the distribution networks High-voltage electrical installations use specialist power cables with a large surface area and low resistance
  • Polish manufacturer of cables and wires - Eltrim
    With innovative solutions, we can offer low production minimums to provide the best offering on the market Eltrim’s products include all types of power cables, signal cables, wiring cables, overhead line conductors, mining cables and many other cables
  • Overhead contact line systems for high-speed rails
    This chapter presents general design and construction principles of overhead contact lines used on Polish railways that pretend to be a part of future HS system The whole description is based on TSI “energy” approach and its requirements
  • Location of existing and planned electric power transmission . . .
    The paper is addressed to analysis of shutdowns occurred in high voltage transmission lines and recorded lightning discharges in Poland The problem is focused on 220kV and 400 kV overhead
  • Analysis of the quality of aluminum overhead conductors after . . .
    In Poland, the length of low-voltage lines is over 444,000 km, of which overhead lines with OHL conductors have the largest share (41%), next − 37% are cable lines and 29% there are lines with insulated wires It follows that there are almost twice as many overhead lines as cable lines


















中文字典-英文字典  2005-2009

|中文姓名英譯,姓名翻譯 |简体中文英文字典