英文字典中文字典Word104.com



中文字典辭典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z   


安裝中文字典英文字典辭典工具!

安裝中文字典英文字典辭典工具!








  • Foreign Language Specialist | U. S. Army - goarmy. com
    Upon graduation of language training at DLI, you will be eligible for an associate degree in foreign language Foreign Language Specialists will be assessed and attend either 35M or 35P Advanced Individual Training Find out more about becoming a Soldier and if a career in the Army is right for you What to know before you join
  • Interstate 35W (Minnesota) - Wikipedia
    Interstate 35W (I-35W) is an Interstate Highway in the US state of Minnesota, passing through downtown Minneapolis It is one of two through routes for I-35 through the Twin Cities of Minneapolis and Saint Paul, the other being I-35E through downtown Saint Paul
  • Downtown Detroit Apartments | 35W
    35W is centrally located in the city’s bustling Capitol Park Historic District Find food and drinks, see games and shows, browse shops and art, stroll parks and trails – all right outside your door
  • I-35W in Burnsville Project - MnDOT
    Access to eastbound Co Rd 42 from southbound I-35W has permanently changed Motorists will now use the newly constructed ramp at Buck Hill Rd to access both eastbound Co Rd 42 and Buck Hill Rd Information about upcoming traffic impacts will be posted as details become available
  • I-35W closure creates 13-mile detour - FOX 9 Minneapolis-St. Paul
    MnDOT will be shutting down several miles of Interstate 35W (I-35W) starting at 9 p m Friday All lanes in both directions will be closed between Interstate 494 (I-494) and the Burnsville
  • Major closure set for I-35W in the Twin Cities this weekend
    Construction season is underway in the Twin Cities, with both sides of a busy stretch of Interstate 35W in the Twin Cities will be closed this weekend
  • I-35W in Burnsville | Scott County, MN
    MNDOT will resurface I-35W between Cliff Road and the Burnsville Split Motorists can expect road, lane and ramp closures as work is completed Preliminary crossover construction will take place October-November 2024 Major construction activities will occur in April 2025 through Fall 2026
  • Amazon. com: 35w Halogen Bulbs
    OHLECTRIC MR16 Halogen Reflector Bulb (6-Pack) 35 Watt, 38° Flood, 120 Volt, 2000 Hour Life Span, Dimmable, GU10 Base, Cover Guard, 3200, ANSI FMW, Ceiling Fixtures, Track Lighting


















中文字典-英文字典  2005-2009

|中文姓名英譯,姓名翻譯 |简体中文英文字典