安裝中文字典英文字典辭典工具!
安裝中文字典英文字典辭典工具!
|
- Proposed Ratings - Physical Evaluation Board Forum
Meb ended (September 28, 2023) Peb accepted (October 13, 2023) Notified unfit for duty (October 26, 2023) Va case closed on website ( November 10, 2023) peb notified of ratings 70 dod 100 VA ( November 13, 2023) -currenly waiting on peb to draft my da 199 to get orders Also medboarding due to MH
- A Detailed Explanation of the DoD IDES MEB PEB Process. . .
Upon acceptance into the DoD IDES MEB PEB process, during the MEB Phase is when all of your medical conditions are reviewed to determine which are "medically unacceptable" or "medically acceptable" conditions The MTF will assign a PEBLO to develop the MEB case file for the MEB phase of the DoD IDES process
- MEB timeline - Physical Evaluation Board Forum
My PCM just put me in for a MEB 8 July 2019 My questions are what time frame am i looking at for separation? My medical records have proper documentation for a MEB,l My PCM request that i do a MEB but i have been telling him im fine i can work On leave i came to the realization that
- 2023 MEB Timeline - Physical Evaluation Board Forum
Currently Undergoing an MEB for a heart condition and wanted to share my timeline since everyone contributing on here has helped me understand the steps in this process 11 Nov 22 – Verbally told by PCM I was going to be submitted for an MEB after official diagnosis 06 Dec 22 – Contacted by
- Timeline | Physical Evaluation Board Forum
Figured I'd post my timeline here :) 26 Nov 24 - Code 37 Applied 26 Nov 24 - PEBLO Brief 2 Dec 24 - CIS signed (Do Not Retain) 19 Dec 24 - Full MEB (AFPC) notification, found unfit 27 Dec 24 - SHA Completed 30 Dec 24 - MSC Brief 16 Jan 25 - C P Exams Completed 23 Jan 25 - DBQs uploaded to
- MEB, DOD unfit conditions? - Physical Evaluation Board Forum
Hello, my local MEB is done but the last person that has to sign off on it was TDY so i should find out everything this week What i'm trying to find out is how conditions are decided DOD unfit or not? My peblo is saying the MEB referred condition is the only DOD unfit condition, if any Would
- JBER timeline | Physical Evaluation Board Forum
I came across this website and seen a lot of timelines from different places but barely any from JBER so here’s my timeline so far Referred to MEB 24 February IDES First contact 24 February IDES VA Brief 03 March 1st C P Appointment 13 March Last C P Appointment 07 April ( 5 total )
- Case Timelines | Physical Evaluation Board Forum
A forum for members to post their case timelines
|
|
|