英文字典中文字典Word104.com



中文字典辭典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z   


安裝中文字典英文字典辭典工具!

安裝中文字典英文字典辭典工具!








  • Simulation of the Secondary Frequency Control Capability of the . . .
    The Sacramento Municipal Utility District (SMUD), as a typical balancing authority and project team member, was suggested by the Advanced Technology Modeling TFG for testing the models of the advanced pump storage hydro technology newly developed in the course of the DOE project and for demonstration of the potential benefits of this technology
  • Confirmatory Survey Results for Class 1 and Class 2 Interior Building . . .
    SMUD used site-specific supplemental DCGLs for Co-60 and Cs-137 for determining surface release criteria (SMUD 2006a and b) ORISE judgmentally selected five grid blocks for confirmatory surveys based upon final status survey (FSS) results which approached unity
  • Existing Homes Retrofit Case Study: SMUDs Energy Efficient Remodel . . .
    Sacramento Municipal Utility District (SMUD) worked with DOE's Building America Program to cut energy use by more than 50% in a rehab of a 1950s tract home in Sacramento
  • Iowa Hill Pumped Storage Project Investigations - Final Technical . . .
    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD) The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s
  • Mechanical cutting of irradiated reactor internal components
    Mechanical cutting methods to volume reduce and package reactor internal components are now a viable solution for stakeholders challenged with the retirement of first generation nuclear facilities The recent completion of the removal of the Reactor Vessel Internals (RVI) from within the Sacramento Municipal Utility District's (SMUD) Rancho Seco Nuclear Power Plant demonstrates that unlike
  • Existing Homes Retrofit Case Study: SMUDs Jean Avenue Remodel . . .
    This case study describes how SMUD teamed with Building America partners to retrofit aging, foreclosed homes into high-performance homes
  • Analysis of Open Automated Demand Response Deployments in California . . .
    This study focused on OpenADR deployments and systems used by the California IOUs and included a summary of the OpenADR deployment from the U S Department of Energy-funded demonstration conducted by the Sacramento Municipal Utility District (SMUD)
  • Construction Support for New Slab Creek Powerhouse Project (Final . . .
    The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1 5 million Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft Water is conveyed from


















中文字典-英文字典  2005-2009

|中文姓名英譯,姓名翻譯 |简体中文英文字典